Skip to content

Zeelandia Office, Warehouse, and Production Facility

Ongoing Works:

  • Conducting an inventory of heating, ventilation, and cooling installations, along with the preparation of technical drawings.
  • Performing an audit of heating, ventilation, and cooling installations, including:
  • Analysis of the ventilation and air conditioning system, along with the entire heating system, in terms of energy consumption and efficiency.
  • Presentation of potential energy-saving measures for heating and electrical systems in the form of a technical report, outlining steps required to reduce energy consumption.
  • Preparing the facility for the replacement of aluminum window joinery in the office and social areas of the building. The replacement involves modern, high-energy-efficient aluminum system windows, covering a total area of 250m².